%0 Thesis %9 Bachelor %A Laila Sholikhatul, Sholikhatul %A Universitas Bojonegoro, %B Agribisnis %D 2026 %F repository:5755 %I Pertanian %K Efisiensi Produksi, Lean Manufacturing, Pemborosan, UMKM, Value Stream Mapping %T Analisis Efisiensi Proses Produksi Kopi Biji Salak Menggunakan Lean Manufacturing dengan Pendekatan Value Stream Mapping (VSM) Pada UD Bunda Arum %U https://repository.unigoro.ac.id/id/eprint/5755/ %X This study aims to analyze the efficiency of the salak coffee bean production process at UD Bunda Arum using Lean Manufacturing with a Value Stream Mapping (VSM) approach. This study uses a quantitative descriptive method with observation, interviews, documentation, and questionnaires. The analysis was conducted through Current State Mapping (CSM), identification of waste using the 3M (Muda, Mura, Muri) and 5W+1H concepts, preparation of Future State Mapping (FSM), and calculation of Process Cycle Efficiency (PCE). The results showed a total production lead time of 168 hours (7 days) with a value-added time of 19 hours. Thus, a PCE value of 11.31% was obtained, indicating a low proportion of value-added activities. Waste was found in almost all stages of the process in the form of waiting and inventory. Although workers' perceptions of efficiency levels were relatively good (83%), objective measurements showed the need for systematic improvements. Proposed improvements through scheduling raw material arrivals, building a solar dryer, scheduling machine maintenance, and balancing the workforce are expected to reduce lead time and increase production efficiency. %Z 22542011005